Agent Note: PR-opened Issue start dates

Status: implemented

English | 中文

Problem

The organization-level Start date Issue field records when work begins, but adding an Issue to the Issue Project or linking it from a pull request does not provide a date value. A pull request can identify both Issues it resolves and Issues that supply related implementation context, and either relationship marks the start of repository work.

Updating the field on every pull-request event would assign dates to existing work after edits, pushes, or reopenings. Replacing an existing date would also discard a manually planned date or a date recorded by an earlier pull request.

Decision

The Issue lifecycle workflow initializes Start date only for pull_request.opened. It reads the pull request's live body, retains every same-repository reference that resolves to an Issue, converts created_at to a calendar date in the configured Project time zone, ensures the Issue is a Project item, and writes the configured organization Issue Date field only when the current value is empty.

The configuration names the field exposed in the Project and the time zone. The Project field must resolve to an organization Issue Date field; the workflow reads its Issue value and updates it through updateIssueFieldValue. Missing configuration fails when the policy module loads; a missing field, a non-Date or Project-local field, an invalid timestamp, or a failed API request fails the workflow at the first relevant pull request.

Event-directed PR review status commands continue to own Status transitions. Date initialization includes resolving and informational Issue references, runs for Draft and automated pull requests, and does not depend on PR policy enforcement.

Verification

Issue-management tests cover the Shanghai date boundary, opened-only dispatch, all retained Issue references, Issue-field discovery, empty-value writes, existing-value preservation, missing Project items, invalid field configuration, and the updateIssueFieldValue variables. Workflow tests require the pull_request.opened subscription.

Alternatives considered

Use a built-in Project workflow. The built-in workflows own fixed Project item and Status transitions; the repository workflow already owns authenticated GraphQL mutations and can supply the PR creation date.

Use a Project-local Date field. A Project field would allow different dates for the same Issue in different Projects and would not appear on the Issue itself. Work begins for the Issue rather than for one Project membership, so the organization Issue field owns the value.

Process every subscribed PR event or run a reconciler. Later events would fill dates for existing pull requests and references added after creation, but they would make the field a repair projection instead of a record created with the pull request and would add repeated Project reads.

Update only resolving Issue references. Informational references also identify Issues whose implementation work begins with the pull request, so the date initializer uses the existing all-reference set while Status transitions retain resolving-only semantics.

Overwrite an existing date. A later pull request must not replace a manual plan or the date written for earlier work, so the mutation follows an empty-value read.

Consequences

Only pull requests opened after the workflow ships initialize dates. References added after creation and existing open pull requests remain unchanged, and the workflow does not scan existing Project items or pull requests. The date follows the Issue across organization Projects that expose the field.

The empty-value read makes retries idempotent in ordinary operation. The Issue-field mutation has no compare-and-set precondition, so simultaneous pull requests that reference the same empty Issue can both write; per-PR concurrency does not serialize that Issue, and the last mutation can win.