deepseek-harness/docs/rfc/implemented
Ziya f5774a2a26 feat(i18n): new documents merge bilingual — the requiredSince date frontier
New docs must not enlarge the translation backlog: any date-named
document (yyyy-mm-dd-*.md, i.e. an RFC) dated on/after the manifest's
requiredSince cutoff must merge with its complete pair, independent of
the required back-catalog list. Cutoff ships at 2026-07-05, so the
existing 2026-07-04 RFC wave is grandfathered into the batch backlog
and everything after is bilingual from birth.

The date comes from the filename, deliberately: it is deterministic
from tree content alone — no git history (shallow CI checkouts hold),
no PR base ref — matching the gate's pure-content design. A proposal
dated before the cutoff that merges later escapes the rule; that is
the graceful grandfathering of in-flight work, not a hole.

--list marks such files (required by date); contract and RFC updated
in both languages and the pairs re-recorded.
2026-07-04 05:41:18 -07:00
..
architecture Merge branch 'worktree-docs-overhaul-b-agents' into worktree-docs-overhaul-c-architecture 2026-07-04 15:50:10 +08:00
feature fix(docs): address Codex review round 2 — repoint every remaining moved-policy citation 2026-07-04 15:43:51 +08:00
process feat(i18n): new documents merge bilingual — the requiredSince date frontier 2026-07-04 05:41:18 -07:00
simplification docs(AGENTS): rewrite the root standing orders to the 1,500-word budget 2026-07-04 14:22:47 +08:00
testing Merge remote-tracking branch 'origin/master' into worktree-docs-overhaul-b-agents 2026-07-04 17:57:16 +08:00
AGENTS.md fix(docs): address Codex review round 1 on the AGENTS.md rewrite 2026-07-04 15:11:49 +08:00
CLAUDE.md docs(rfc): keep implemented RFCs current; rewrite the llm-replay section in place 2026-06-19 17:06:20 +08:00